Wraparound extensions for homes in Putney
Putney homeowners can use us for the whole wraparound extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in PutneyFrom £46,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsSW6, SW13, SW14, SW15, SW18

Wraparound extension prices in Putney
Prices below are for Putney, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Putney: £2,600 to £4,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £46,500 – £56,500 | £53,500 – £68,000 | £67,500 – £87,000 |
| Medium L-shape 25 m² | £65,000 – £78,000 | £74,500 – £94,500 | £94,000 – £120,500 |
| Large L-shape 32 m² | £83,000 – £100,000 | £95,500 – £121,000 | £120,500 – £154,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Who a wraparound extension suits
- Semi-detached houses with a side passage
- Terraced houses that want the largest ground floor possible
- Families who want kitchen, dining and living in one space
Covering Putney
Our survey diary covers Putney, including SW6, SW13, SW14, SW15, SW18, W6. Neighbouring towns we cover include Roehampton (1 mile), Barnes (2 miles), Fulham (2 miles), Earlsfield (2 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Do I need planning permission in Putney?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Putney home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about wraparound extensions
How long does a wraparound extension take to build in Putney?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Putney, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Putney?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Book a free site visit in Putney
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.