Wraparound extensions in Northamptonshire
Our design and build teams take on wraparound extensions in Northamptonshire, from the first measured survey through planning and building control to the finished room.
- Guide priceFrom £34,000 inc VAT
- PlanningUsually a householder application
- Towns covered9
- Site visitFree, no obligation

Towns in Northamptonshire
Wraparound extension prices in Northamptonshire
For Northamptonshire we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Northamptonshire: £1,900 to £3,520 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,000 – £41,500 | £39,000 – £50,000 | £49,500 – £63,500 |
| Medium L-shape 25 m² | £47,500 – £57,000 | £54,500 – £69,000 | £68,500 – £88,000 |
| Large L-shape 32 m² | £60,500 – £73,000 | £69,500 – £88,500 | £88,000 – £112,500 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Northamptonshire?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Householder planning application
- Roof with glazing along the side return
- Survey, design and 3D layout options
- Party wall notice support (England and Wales)
Local to Northamptonshire
Towns we cover in Northamptonshire include Northampton, Corby, Kettering, Wellingborough, Rushden, Daventry, Market Harborough, Towcester. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Northamptonshire home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Northamptonshire
How long does a wraparound extension take to build in Northamptonshire?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Northamptonshire, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Northamptonshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Book a free site visit in Northamptonshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.