Annexe extensions for homes in Morden
Our design and build teams take on annexe extensions in Morden, from the first measured survey through planning and building control to the finished room.
- Guide price in MordenFrom £71,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsCR4, SM1, SM3, SM4, SW19

How much does an annexe extension cost in Morden?
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Morden: £2,600 to £4,940 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £71,500 – £89,500 | £78,000 – £97,500 | £97,500 – £123,500 |
| One-bedroom annexe 35 m² | £91,000 – £114,000 | £109,000 – £136,500 | £136,500 – £173,000 |
| Larger annexe 45 m² | £117,000 – £146,500 | £140,000 – £175,500 | £175,500 – £222,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around Morden
We cover Morden and the postcode districts CR4, SM1, SM3, SM4, SW19, SW20. We also work in nearby Mitcham (1 mile), Wimbledon (2 miles), Worcester Park (2 miles), Tooting (2 miles).
Ewell, in Surrey, is roughly 4 miles from Morden and also on our list. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Planning and approvals in Morden
In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.
The planning position for a specific Morden address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Separate or shared heating and hot water
- Design for accessibility: level thresholds, wider doors, walk-in shower
- Fire separation and alarms to building regulations
- Kitchenette, shower room and bedroom finish
- Planning application describing ancillary use
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Annexe extension questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Morden, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Morden?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Morden be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Can the annexe have its own front door?
Yes, many do, but it should still connect to the main house to stay clearly part of it.
Book a free site visit in Morden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.