Wraparound extensions across Haverhill

Our design and build teams take on wraparound extensions in Haverhill, from the first measured survey through planning and building control to the finished room.

  • Guide price in HaverhillFrom £38,000 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsCB9
L-shaped wraparound extension on a brick terraced house at dusk

Planning and approvals in Haverhill

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

The planning position for a specific Haverhill address depends on its history and any designations, which is why we check it at the first visit.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

How much does a wraparound extension cost in Haverhill?

Labour and material costs vary across the UK, so for Haverhill we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Haverhill: £2,120 to £3,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£38,000 – £46,000£43,500 – £55,500£55,000 – £71,000
Medium L-shape
25 m²
£53,000 – £64,000£60,500 – £77,000£76,500 – £98,500
Large L-shape
32 m²
£67,500 – £81,500£78,000 – £98,500£98,000 – £126,000

For a figure based on your own dimensions, use our guide-price tool.

Covering Haverhill

Across CB9, we can visit, measure and advise. Neighbouring towns we cover include Newmarket (11 miles), Sudbury (13 miles), Bury St Edmunds (16 miles), Stowmarket (25 miles).

For homes towards Essex, Braintree is around 15 miles away. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.

Who a wraparound extension suits

  • Families who want kitchen, dining and living in one space
  • Terraced houses that want the largest ground floor possible
  • Semi-detached houses with a side passage

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Wraparound extension questions answered

Will my neighbours in Haverhill be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Haverhill?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a wraparound extension in Haverhill?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Is a wraparound better than a side return alone?

It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.

Do wraparound extensions need planning permission?

Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.

Book a free site visit in Haverhill

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote