Haverhill double-storey extensions, designed and built
Planning a double-storey extension in Haverhill? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in HaverhillFrom £40,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsCB9

Included in a typical project
- Measured survey, design and planning drawings
- Householder planning application where needed
- Breaking through at both levels, stairs and landing changes where needed
- Foundations sized for two floors
What should I budget for a double-storey extension in Haverhill?
For Haverhill we adjust our national guide rates by ×1.06, the factor we use for East of England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Haverhill: £1,640 to £3,180 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £40,000 – £48,500 | £45,500 – £60,000 | £58,500 – £76,500 |
| 4 m × 4 m, two floors 32 m² | £52,500 – £63,000 | £61,000 – £80,000 | £78,000 – £102,000 |
| 4 m × 6 m, two floors 48 m² | £78,500 – £94,500 | £91,500 – £120,000 | £117,000 – £153,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Haverhill
Our survey diary covers Haverhill, including CB9. Neighbouring towns we cover include Newmarket (11 miles), Sudbury (13 miles), Bury St Edmunds (16 miles), Stowmarket (25 miles).
Braintree, in Essex, is roughly 15 miles from Haverhill and also on our list. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Will the council need to approve it?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Double-storey extension questions answered
Who do I contract with for a double-storey extension in Haverhill?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a double-storey extension take to build in Haverhill?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Haverhill?
Yes. We cover Haverhill and the surrounding parts of Suffolk. Site visits are free and there is no obligation.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £1,640 to £3,180 per m² of new floor area including VAT, compared with £1,860 to £3,600 per m² for single-storey work, because the foundations and roof are shared across two floors.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Book a free site visit in Haverhill
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.