Wraparound extensions for homes in Gorseinon
Planning a wraparound extension in Gorseinon? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in GorseinonFrom £33,000 inc VAT
- PlanningUsually a planning application
- Build time14–20 weeks on site
- Postcode districtsSA4

Do I need planning permission in Gorseinon?
In Wales a wraparound must satisfy both the rear and side extension limits to be permitted development, so most need a planning application to the council.
The planning position for a specific Gorseinon address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
Extensions in and around Gorseinon
We cover Gorseinon and the postcode districts SA4. The same team covers Swansea (5 miles), Clydach (6 miles), Briton Ferry (10 miles), Neath (10 miles), all within easy reach.
Llanelli, in Dyfed, is roughly 5 miles from Gorseinon and also on our list. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.
Guide prices for Gorseinon
For Gorseinon we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Gorseinon: £1,860 to £3,440 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £33,000 – £40,500 | £38,500 – £49,000 | £48,500 – £62,000 |
| Medium L-shape 25 m² | £46,500 – £56,000 | £53,000 – £67,500 | £67,000 – £86,500 |
| Large L-shape 32 m² | £59,500 – £71,500 | £68,000 – £86,500 | £86,000 – £110,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Is a wraparound extension right for your house?
- Semi-detached houses with a side passage
- Families who want kitchen, dining and living in one space
- Terraced houses that want the largest ground floor possible
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a wraparound extension in Gorseinon
How long does a wraparound extension take to build in Gorseinon?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Gorseinon, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Gorseinon be involved?
If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Book a free site visit in Gorseinon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end