house-extension.uk

Building regulations for extensions in Gorseinon

For Gorseinon homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in GorseinonFrom £800 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsSA4
Builder installing a steel beam over a new rear opening on acrow props

What is included

  • Building regulations drawings and written specification
  • Structural calculations for beams, lintels and foundations
  • Inspection bookings throughout the build
  • Completion certificate on sign-off

Extensions in and around Gorseinon

We cover Gorseinon and the postcode districts SA4. The same team covers Swansea (5 miles), Clydach (6 miles), Briton Ferry (10 miles), Neath (10 miles), all within easy reach.

In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

Planning rules that apply in Gorseinon

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

Homes in conservation areas, national parks, National Landscapes (AONBs) and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

What it costs in Gorseinon

Guide fees for Gorseinon including VAT, using our Wales factor of ×0.93. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£800 – £1,700
StandardDrawings plus structural calculations£1,200 – £2,450
PremiumComplex or two-storey pack with energy calculations£2,000 – £3,550

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.

Try the guide-price tool to see a range for your own size and finish.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions answered

How long does this take for a Gorseinon home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Gorseinon, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who do I contract with in Gorseinon?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Gorseinon

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote