Wraparound extensions across Dunstable
Our design and build teams take on wraparound extensions in Dunstable, from the first measured survey through planning and building control to the finished room.
- Guide price in DunstableFrom £38,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsLU4, LU5, LU6

Guide prices for Dunstable
Labour and material costs vary across the UK, so for Dunstable we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Dunstable: £2,120 to £3,920 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £38,000 – £46,000 | £43,500 – £55,500 | £55,000 – £71,000 |
| Medium L-shape 25 m² | £53,000 – £64,000 | £60,500 – £77,000 | £76,500 – £98,500 |
| Large L-shape 32 m² | £67,500 – £81,500 | £78,000 – £98,500 | £98,000 – £126,000 |
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a wraparound extension suits
- Terraced houses that want the largest ground floor possible
- Families who want kitchen, dining and living in one space
- Semi-detached houses with a side passage
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
Working in Dunstable
We cover Dunstable and the postcode districts LU4, LU5, LU6. Nearby, we also take on projects in Luton (5 miles), Leighton Buzzard (6 miles), Ampthill (10 miles), Kempston (16 miles).
Just over the Hertfordshire border, Harpenden is about 9 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Dunstable home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Wraparound extension questions answered
Will my neighbours in Dunstable be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Dunstable?
Yes. We cover Dunstable and the surrounding parts of Bedfordshire. Site visits are free and there is no obligation.
Do I need building regulations approval in Dunstable?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Dunstable
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.