house-extension.uk

Building regulations for extensions in Dunstable

Need building regulations for extensions in Dunstable? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in DunstableFrom £950 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsLU4, LU5, LU6
Builder installing a steel beam over a new rear opening on acrow props

When it helps

  • Every extension, whatever the planning route
  • Homeowners using their own builder who need the drawings
  • Glass-heavy designs that need energy calculations

Covering Dunstable

We cover Dunstable and the postcode districts LU4, LU5, LU6. Nearby, we also take on projects in Luton (5 miles), Leighton Buzzard (6 miles), Ampthill (10 miles), Kempston (16 miles).

Just over the Hertfordshire border, Harpenden is about 9 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

What it costs in Dunstable

Fees below are our Dunstable guide (×1.06, the East of England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£950 – £1,950
StandardDrawings plus structural calculations£1,350 – £2,800
PremiumComplex or two-storey pack with energy calculations£2,300 – £4,050

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Dunstable

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Dunstable

Do you cover all of Dunstable?

Yes. We cover Dunstable and the surrounding parts of Bedfordshire. Site visits are free and there is no obligation.

Who do I contract with in Dunstable?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does this take for a Dunstable home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Dunstable

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote