Utility and boot room extensions across Wimbledon

Our design and build teams take on utility room extensions in Wimbledon, from the first measured survey through planning and building control to the finished room.

  • Guide price in WimbledonFrom £18,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsCR4, SM4, SW17, SW18, SW19
Utility and boot room with stacked washer and dryer, bench and coat hooks

What should I budget for a utility room extension in Wimbledon?

For Wimbledon we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Wimbledon: £2,470 to £4,550 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£18,000 – £22,000£18,000 – £23,000£18,000 – £23,000
2.5 m × 3.2 m
8 m²
£19,500 – £23,500£23,000 – £29,500£29,000 – £36,500
3 m × 3.6 m
11 m²
£27,000 – £32,500£32,000 – £40,500£40,000 – £50,500

Try the guide-price tool to see a range for your own size and finish.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who a utility room extension suits

  • Busy family homes
  • Kitchens that have run out of space for appliances
  • Houses with a side passage or small rear corner

A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.

Local to Wimbledon

Site visits are available across Wimbledon (CR4, SM4, SW17, SW18, SW19, SW20). Neighbouring towns we cover include Morden (2 miles), Earlsfield (2 miles), Tooting (2 miles), Mitcham (2 miles).

London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Utility room extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Wimbledon, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a utility room extension take to build in Wimbledon?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Do you cover all of Wimbledon?

Yes. We cover Wimbledon and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Book a free site visit in Wimbledon

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote