Utility and boot room extensions across Reigate

A utility room extension in Reigate starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in ReigateFrom £15,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsRH2
Utility and boot room with stacked washer and dryer, bench and coat hooks

What should I budget for a utility room extension in Reigate?

Prices below are for Reigate, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Reigate: £2,130 to £3,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£15,500 – £19,000£15,500 – £20,000£15,500 – £20,000
2.5 m × 3.2 m
8 m²
£17,000 – £20,500£20,000 – £25,500£25,000 – £31,500
3 m × 3.6 m
11 m²
£23,000 – £28,000£27,500 – £34,500£34,000 – £43,500

Want a range for your exact size? The guide-price tool takes about a minute.

Working in Reigate

Across RH2, we can visit, measure and advise. The same team covers Redhill (2 miles), Horley (5 miles), Banstead (6 miles), Caterham (6 miles), all within easy reach.

Coulsdon, in Greater London, is roughly 6 miles from Reigate and also on our list. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Who a utility room extension suits

  • Houses with a side passage or small rear corner
  • Kitchens that have run out of space for appliances
  • Busy family homes

Do I need planning permission in Reigate?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about utility room extensions

Will my neighbours in Reigate be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a utility room extension take to build in Reigate?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Reigate, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Book a free site visit in Reigate

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote