Utility and boot room extensions across New Milton

If you live in New Milton and want more space without moving, a utility room extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in New MiltonFrom £15,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsBH25
Utility and boot room with stacked washer and dryer, bench and coat hooks

Guide prices for New Milton

Labour and material costs vary across the UK, so for New Milton we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.

Typical rates in New Milton: £2,130 to £3,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£15,500 – £19,000£15,500 – £20,000£15,500 – £20,000
2.5 m × 3.2 m
8 m²
£17,000 – £20,500£20,000 – £25,500£25,000 – £31,500
3 m × 3.6 m
11 m²
£23,000 – £28,000£27,500 – £34,500£34,000 – £43,500

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around New Milton

Across BH25, we can visit, measure and advise. Neighbouring towns we cover include Hythe (14 miles), Totton (14 miles), Southampton (15 miles), Eastleigh (20 miles).

For homes towards Dorset, Christchurch is around 5 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

What is included

  • Built-in storage or space ready for your units
  • Waste and water connections
  • Design around appliances, sink and storage
  • Back door and a hard-wearing floor

A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.

Planning rules that apply in New Milton

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Your questions about a utility room extension in New Milton

Who do I contract with for a utility room extension in New Milton?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a utility room extension take to build in New Milton?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Do you cover all of New Milton?

Yes. We cover New Milton and the surrounding parts of Hampshire. Site visits are free and there is no obligation.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Book a free site visit in New Milton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote