Single-storey rear extensions in New Milton
A single-storey extension in New Milton starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in New MiltonFrom £23,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsBH25

Guide prices for New Milton
For New Milton we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in New Milton: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £23,500 – £28,000 | £27,500 – £35,000 | £34,500 – £46,000 |
| 4 m × 5 m 20 m² | £39,000 – £46,000 | £45,500 – £58,500 | £58,000 – £76,500 |
| 5 m × 6 m 30 m² | £58,500 – £69,000 | £68,500 – £87,500 | £87,000 – £114,500 |
Try the guide-price tool to see a range for your own size and finish.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific New Milton address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around New Milton
Our survey diary covers New Milton, including BH25. We also work in nearby Hythe (14 miles), Totton (14 miles), Southampton (15 miles), Eastleigh (20 miles).
Just over the Dorset border, Christchurch is about 5 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
What is included
- Walls, steel beams and the new opening into the house
- Measured survey and design
- Building regulations drawings and structural calculations
- Foundations, drainage and groundworks
- Doors, windows, insulation, plastering and first fix to finish
- Planning route checked and the right approval obtained
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in New Milton
Do I need building regulations approval in New Milton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of New Milton?
Yes. We cover New Milton and the surrounding parts of Hampshire. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for New Milton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How deep can a single-storey rear extension be without planning permission?
In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.
Flat roof or pitched roof?
Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.
Book a free site visit in New Milton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.