house-extension.uk

Utility and boot room extensions for homes in Leicester

From the first sketch to final sign-off, we plan and build utility room extensions in Leicester and the surrounding Leicestershire area.

  • Guide price in LeicesterFrom £13,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsLE1, LE2, LE3, LE4, LE5
Utility and boot room with stacked washer and dryer, bench and coat hooks

How much does a utility room extension cost in Leicester?

Labour and material costs vary across the UK, so for Leicester we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Leicester: £1,800 to £3,320 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£13,000 – £16,000£13,000 – £17,000£13,000 – £17,000
2.5 m × 3.2 m
8 m²
£14,000 – £17,500£17,000 – £21,500£21,000 – £27,000
3 m × 3.6 m
11 m²
£19,500 – £24,000£23,500 – £29,500£29,000 – £37,000

For a figure based on your own dimensions, use our guide-price tool.

Covering Leicester

Site visits are available across Leicester (LE1, LE2, LE3, LE4, LE5, LE7). We also work in nearby Oadby (3 miles), Wigston (4 miles), Earl Shilton (9 miles), Loughborough (9 miles).

The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

The planning position for a specific Leicester address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

When a utility room extension makes sense

  • Kitchens that have run out of space for appliances
  • Houses with a side passage or small rear corner
  • Busy family homes

A good utility works like a back-of-house corridor: in from the garden, boots off, coats on hooks, washing on the way through. We plan the door positions so it doesn't become another room to walk around.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Utility room extension questions answered

Do I need building regulations approval in Leicester?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Leicester be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a utility room extension take to build in Leicester?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

How much does a utility room extension cost?

Our guide range is about £1,800 to £3,320 per m² including VAT, with a minimum of around £13,500. An 8 m² standard-spec utility is typically £17,000 to £21,500 in Leicester.

Book a free site visit in Leicester

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote