Hebburn utility room extensions, designed and built
If you live in Hebburn and want more space without moving, a utility room extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in HebburnFrom £12,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsNE6, NE28, NE31, NE32

What should I budget for a utility room extension in Hebburn?
Labour and material costs vary across the UK, so for Hebburn we use our North East England factor (×0.91). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Hebburn: £1,730 to £3,180 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £12,500 – £15,500 | £12,500 – £16,000 | £12,500 – £16,000 |
| 2.5 m × 3.2 m 8 m² | £13,500 – £16,500 | £16,000 – £20,500 | £20,000 – £25,500 |
| 3 m × 3.6 m 11 m² | £19,000 – £23,000 | £22,500 – £28,500 | £28,000 – £35,500 |
For a figure based on your own dimensions, use our guide-price tool.
Who a utility room extension suits
- Houses with a side passage or small rear corner
- Kitchens that have run out of space for appliances
- Busy family homes
Covering Hebburn
We cover Hebburn and the postcode districts NE6, NE28, NE31, NE32. The same team covers Jarrow (1 mile), Wallsend (1 mile), Felling (3 miles), Gateshead (4 miles), all within easy reach.
For homes towards County Durham, Chester-le-Street is around 8 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
Planning and approvals in Hebburn
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Utility room extension questions answered
Who do I contract with for a utility room extension in Hebburn?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Hebburn be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Hebburn?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Does a utility extension need planning permission?
Often not, if it is single storey and within permitted development limits. We check this for your property.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
Book a free site visit in Hebburn
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.