house-extension.uk

Utility and boot room extensions in Dunoon

Dunoon projects are quoted by arrangement: we plan the design, approvals and build carefully around travel and material deliveries, and confirm any travel costs up front.

  • Guide price in DunoonFrom £13,500 inc VAT
  • PlanningScottish householder rules; building warrant needed
  • Build time6–10 weeks on site
  • Postcode districtsPA23
Utility and boot room with stacked washer and dryer, bench and coat hooks

Working in Dunoon

Site visits are available across Dunoon (PA23). Island and remote projects are planned individually, with travel, deliveries and accommodation for the team agreed before the survey.

Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.

Who a utility room extension suits

  • Houses with a side passage or small rear corner
  • Kitchens that have run out of space for appliances
  • Busy family homes

Utility room extension prices in Dunoon

Prices below are for Dunoon, using the Scotland factor of ×0.98. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Dunoon: £1,860 to £3,430 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£13,500 – £16,500£13,500 – £17,500£13,500 – £17,500
2.5 m × 3.2 m
8 m²
£14,500 – £18,000£17,500 – £22,000£21,500 – £27,500
3 m × 3.6 m
11 m²
£20,000 – £24,500£24,000 – £30,500£30,000 – £38,000

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Dunoon?

In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted. Separately, almost every extension needs a building warrant from the council before work starts.

Homes in conservation areas, national scenic areas and listed buildings have tighter rules, so we always check the property's status and planning history before design starts.

Building close to a public sewer needs the agreement of Scottish Water, which we check during design.

Applications are decided by your council as planning authority.

From first visit to completion

Visits to Dunoon are arranged around travel; we confirm any travel costs in writing before the survey.

  1. Site visit by arrangement

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Your questions about a utility room extension in Dunoon

Do I need building regulations approval in Dunoon?

Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.

Who do I contract with for a utility room extension in Dunoon?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a utility room extension take to build in Dunoon?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

How much does a utility room extension cost?

Our guide range is about £1,860 to £3,430 per m² including VAT, with a minimum of around £14,000. An 8 m² standard-spec utility is typically £17,500 to £22,000 in Dunoon.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Talk to us about a project in Dunoon

We will talk through the project, the planning position and how we would organise the visit and the build.

  • Site visit arranged around travel, costs agreed first
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Send us your project details

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote