Dunoon double-storey extensions, designed and built
Dunoon projects are quoted by arrangement: we plan the design, approvals and build carefully around travel and material deliveries, and confirm any travel costs up front.
- Guide price in DunoonFrom £37,000 inc VAT
- PlanningUsually planning permission; building warrant needed
- Build time16–24 weeks on site
- Postcode districtsPA23

Extensions in and around Dunoon
Across PA23, we can visit, measure and advise. Island and remote projects are planned individually, with travel, deliveries and accommodation for the team agreed before the survey.
Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
Double-storey extension prices in Dunoon
These guide figures apply our Scotland adjustment (×0.98) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Dunoon: £1,520 to £2,940 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £37,000 – £44,500 | £42,000 – £55,500 | £54,000 – £71,000 |
| 4 m × 4 m, two floors 32 m² | £48,500 – £58,500 | £56,000 – £74,000 | £72,000 – £94,500 |
| 4 m × 6 m, two floors 48 m² | £72,500 – £87,500 | £84,500 – £111,000 | £108,000 – £141,500 |
Try the guide-price tool to see a range for your own size and finish.
Who a double-storey extension suits
- Houses with enough distance to the rear or side boundary
- Homeowners who would otherwise consider moving
- Growing families who need a bedroom as well as a bigger kitchen
Planning rules that apply in Dunoon
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Applications are decided by your council as planning authority.
From first visit to completion
Visits to Dunoon are arranged around travel; we confirm any travel costs in writing before the survey.
Site visit by arrangement
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Dunoon
Do you cover all of Dunoon?
Yes. We cover Dunoon and the surrounding parts of Argyll and Bute. Projects here are taken on by arrangement because of travel, and any travel costs are agreed before the survey.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Dunoon, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Dunoon?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £1,520 to £2,940 per m² of new floor area including VAT, compared with £1,720 to £3,330 per m² for single-storey work, because the foundations and roof are shared across two floors.
Talk to us about a project in Dunoon
We will talk through the project, the planning position and how we would organise the visit and the build.
- Site visit arranged around travel, costs agreed first
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Send us your project details
Tell us a little about the project and we will arrange a time.