Burnley utility room extensions, designed and built
If you live in Burnley and want more space without moving, a utility room extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in BurnleyFrom £13,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time6–10 weeks on site
- Postcode districtsBB8, BB9, BB10, BB11, BB12

Extensions in and around Burnley
Our survey diary covers Burnley, including BB8, BB9, BB10, BB11, BB12. Neighbouring towns we cover include Nelson (3 miles), Colne (5 miles), Accrington (6 miles), Rawtenstall (7 miles).
Rochdale, in Greater Manchester, is roughly 13 miles from Burnley and also on our list. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
Guide prices for Burnley
Labour and material costs vary across the UK, so for Burnley we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Burnley: £1,800 to £3,320 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 2.5 m 5 m² | £13,000 – £16,000 | £13,000 – £17,000 | £13,000 – £17,000 |
| 2.5 m × 3.2 m 8 m² | £14,000 – £17,500 | £17,000 – £21,500 | £21,000 – £27,000 |
| 3 m × 3.6 m 11 m² | £19,500 – £24,000 | £23,500 – £29,500 | £29,000 – £37,000 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Burnley?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Built-in storage or space ready for your units
- Design around appliances, sink and storage
- Waste and water connections
- Ventilation for a tumble dryer
- Back door and a hard-wearing floor
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a utility room extension in Burnley
Who do I contract with for a utility room extension in Burnley?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Burnley, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a utility room extension take to build in Burnley?
On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Can a utility have a toilet?
Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.
How much does a utility room extension cost?
Our guide range is about £1,800 to £3,320 per m² including VAT, with a minimum of around £13,500. An 8 m² standard-spec utility is typically £17,000 to £21,500 in Burnley.
Book a free site visit in Burnley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.