Timber frame extensions for homes in Newcastle-under-Lyme
Planning a timber frame extension in Newcastle-under-Lyme? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in Newcastle-under-LymeFrom £20,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsST1, ST2, ST4, ST5, ST6

What is included
- Cladding, render or brick slip finish
- Breathable wall build-up with insulation
- Fire and acoustic details where needed
- Foundations, often lighter than masonry
- Frame design and structural calculations
Guide prices for Newcastle-under-Lyme
These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Newcastle-under-Lyme: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,000 – £24,500 | £23,500 – £31,000 | £30,000 – £40,000 |
| 4 m × 5 m 20 m² | £33,500 – £41,000 | £39,500 – £51,500 | £50,000 – £66,000 |
| 5 m × 6 m 30 m² | £50,500 – £61,500 | £59,500 – £77,500 | £75,500 – £99,000 |
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in Newcastle-under-Lyme?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Newcastle-under-Lyme
We cover Newcastle-under-Lyme and the postcode districts ST1, ST2, ST4, ST5, ST6, ST12. Nearby, we also take on projects in Stoke-on-Trent (2 miles), Longton (4 miles), Kidsgrove (6 miles), Leek (11 miles).
Crewe, in Cheshire, is roughly 11 miles from Newcastle-under-Lyme and also on our list. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Newcastle-under-Lyme
How long does a timber frame extension take to build in Newcastle-under-Lyme?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in Newcastle-under-Lyme?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Newcastle-under-Lyme be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,700 to £3,300 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Newcastle-under-Lyme
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.