Timber frame extensions in New Milton: design, approvals and build

We design and build timber frame extensions for houses in New Milton, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in New MiltonFrom £23,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–14 weeks on site
  • Postcode districtsBH25
Timber frame extension under construction with OSB sheathing and roof joists

Who a timber frame extension suits

  • Homeowners who want strong energy performance
  • Sites where weight or speed matters
  • Contemporary designs with timber or board cladding

Guide prices for New Milton

These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in New Milton: £1,960 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£23,500 – £28,500£27,500 – £36,000£34,500 – £46,000
4 m × 5 m
20 m²
£39,000 – £47,500£45,500 – £59,500£58,000 – £76,500
5 m × 6 m
30 m²
£58,500 – £71,000£68,500 – £89,500£87,000 – £114,500

Want a range for your exact size? The guide-price tool takes about a minute.

Planning rules that apply in New Milton

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering New Milton

Postcode districts we cover around New Milton include BH25. We also work in nearby Hythe (14 miles), Totton (14 miles), Southampton (15 miles), Eastleigh (20 miles).

For homes towards Dorset, Christchurch is around 5 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your New Milton home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about timber frame extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for New Milton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need building regulations approval in New Milton?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of New Milton?

Yes. We cover New Milton and the surrounding parts of Hampshire. Site visits are free and there is no obligation.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,960 to £3,810 per m² including VAT.

Book a free site visit in New Milton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote