house-extension.uk

Timber frame extensions across Coleraine

If you live in Coleraine and want more space without moving, a timber frame extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in ColeraineFrom £18,000 inc VAT
  • PlanningNI permitted development (rear 3–4 m) or planning
  • Build time8–14 weeks on site
  • Postcode districtsBT52
Timber frame extension under construction with OSB sheathing and roof joists

What should I budget for a timber frame extension in Coleraine?

Prices below are for Coleraine, using the Northern Ireland factor of ×0.86. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Coleraine: £1,500 to £2,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£18,000 – £22,000£21,000 – £27,500£26,500 – £35,500
4 m × 5 m
20 m²
£30,000 – £36,500£35,000 – £46,000£44,500 – £58,500
5 m × 6 m
30 m²
£45,000 – £54,500£52,500 – £68,500£67,000 – £88,000

Want a range for your exact size? The guide-price tool takes about a minute.

Planning rules that apply in Coleraine

In Northern Ireland the Planning (General Permitted Development) Order 2015 lets some single-storey rear extensions go ahead without planning permission, up to 3 m on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Larger, side and two-storey extensions normally need planning permission from the council, and building control approval is separate.

In a conservation area or area of townscape character the permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition, any extension needs an application.

Northern Ireland has no Party Wall Act. Where work is on or close to a shared boundary, we agree access and protection with your neighbour in writing before work starts.

In Northern Ireland building control is run by the councils under the Building Regulations (Northern Ireland). We submit full plans or a building notice and book the inspections through to completion.

Applications are decided by your council, which handles local planning in Northern Ireland.

Working in Coleraine

Our survey diary covers Coleraine, including BT52. We also work in nearby Limavady (13 miles), Magherafelt (26 miles), Derry/Londonderry (27 miles).

Northern Ireland's housing ranges from city terraces to large numbers of detached houses and bungalows on rural plots, many in render, where single-storey extensions fit easily.

Who a timber frame extension suits

  • Contemporary designs with timber or board cladding
  • Sites where weight or speed matters
  • Homeowners who want strong energy performance

Moisture is the enemy of any timber building. We design ventilated cladding cavities, breather membranes and a proper damp-proof course height, and keep the frame dry during construction.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about timber frame extensions

Will my neighbours in Coleraine be involved?

If a planning application is needed, the council notifies neighbours. Where work is close to a shared boundary, we agree access and protection with them in writing.

How long does a timber frame extension take to build in Coleraine?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Do you cover all of Coleraine?

Yes. We cover Coleraine and the surrounding parts of County Londonderry. Site visits are free and there is no obligation.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,500 to £2,920 per m² including VAT.

Book a free site visit in Coleraine

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote