house-extension.uk

Orangery extensions for homes in Coleraine

We design and build orangery extensions for houses in Coleraine, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in ColeraineFrom £25,500 inc VAT
  • PlanningNI permitted development (rear 3–4 m) or planning
  • Build time10–16 weeks on site
  • Postcode districtsBT52
Orangery extension with brick piers, a glass roof lantern and French doors

What should I budget for an orangery extension in Coleraine?

These guide figures apply our Northern Ireland adjustment (×0.86) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Coleraine: £2,060 to £3,870 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£25,500 – £31,500£28,500 – £36,500£35,000 – £46,500
4 m × 4 m
16 m²
£33,000 – £40,000£38,500 – £48,500£46,500 – £62,000
4 m × 6 m
24 m²
£49,500 – £60,000£57,500 – £72,500£70,000 – £93,000

Want a range for your exact size? The guide-price tool takes about a minute.

Who an orangery extension suits

  • Period and detached houses with a garden view
  • Those who want daylight without overheating
  • Homeowners replacing an older conservatory

The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.

Will the council need to approve it?

In Northern Ireland the Planning (General Permitted Development) Order 2015 lets some single-storey rear extensions go ahead without planning permission, up to 3 m on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Larger, side and two-storey extensions normally need planning permission from the council, and building control approval is separate.

In a conservation area or area of townscape character the permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition, any extension needs an application.

In Northern Ireland building control is run by the councils under the Building Regulations (Northern Ireland). We submit full plans or a building notice and book the inspections through to completion.

Northern Ireland has no Party Wall Act. Where work is on or close to a shared boundary, we agree access and protection with your neighbour in writing before work starts.

Applications are decided by your council, which handles local planning in Northern Ireland.

Covering Coleraine

Site visits are available across Coleraine (BT52). We also work in nearby Limavady (13 miles), Magherafelt (26 miles), Derry/Londonderry (27 miles).

Just over the County Antrim border, Ballymena is about 24 miles away. In Northern Ireland, extension projects follow the NI planning rules and council building control, which we account for from the first survey.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions people ask about orangery extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Coleraine, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need building regulations approval in Coleraine?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does an orangery extension take to build in Coleraine?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

How much does an orangery cost?

Our guide range is about £2,060 to £3,870 per m² including VAT, so a 16 m² standard-spec orangery is typically £38,500 to £48,500 in Coleraine.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Book a free site visit in Coleraine

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote