house-extension.uk

Timber frame extensions in Coalville

Our design and build teams take on timber frame extensions in Coalville, from the first measured survey through planning and building control to the finished room.

  • Guide price in CoalvilleFrom £19,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–14 weeks on site
  • Postcode districtsLE67
Timber frame extension under construction with OSB sheathing and roof joists

Working in Coalville

Our survey diary covers Coalville, including LE67. The same team covers Loughborough (8 miles), Earl Shilton (10 miles), Leicester (12 miles), Hinckley (13 miles), all within easy reach.

Just over the Derbyshire border, Swadlincote is about 9 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Included in a typical project

  • Foundations, often lighter than masonry
  • Frame design and structural calculations
  • Cladding, render or brick slip finish
  • Fire and acoustic details where needed

What should I budget for a timber frame extension in Coalville?

Prices below are for Coalville, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Coalville: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£19,500 – £24,000£23,000 – £30,500£29,500 – £39,000
4 m × 5 m
20 m²
£33,000 – £40,000£38,500 – £50,500£49,000 – £65,000
5 m × 6 m
30 m²
£49,500 – £60,000£58,000 – £76,000£74,000 – £97,000

Try the guide-price tool to see a range for your own size and finish.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Your questions about a timber frame extension in Coalville

Do you cover all of Coalville?

Yes. We cover Coalville and the surrounding parts of Leicestershire. Site visits are free and there is no obligation.

Do I need building regulations approval in Coalville?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a timber frame extension take to build in Coalville?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,660 to £3,230 per m² including VAT.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Book a free site visit in Coalville

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote