Timber frame extensions in Acton: design, approvals and build
A timber frame extension in Acton starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in ActonFrom £27,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsTW8, W3, W4, W5, W12

Timber frame extension prices in Acton
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Acton: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £31,500 – £41,500 | £40,500 – £53,500 |
| 4 m × 5 m 20 m² | £45,500 – £55,000 | £53,000 – £69,000 | £67,500 – £88,500 |
| 5 m × 6 m 30 m² | £68,000 – £82,000 | £79,500 – £103,500 | £101,000 – £133,000 |
For a figure based on your own dimensions, use our guide-price tool.
Local to Acton
Our survey diary covers Acton, including TW8, W3, W4, W5, W12, W13. The same team covers Chiswick (1 mile), Harlesden (2 miles), Shepherds Bush (2 miles), Willesden (2 miles), all within easy reach.
For homes towards Surrey, East Molesey is around 8 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Planning rules that apply in Acton
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Breathable wall build-up with insulation
- Fire and acoustic details where needed
- Foundations, often lighter than masonry
- Cladding, render or brick slip finish
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a timber frame extension in Acton
Who do I contract with for a timber frame extension in Acton?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Acton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a timber frame extension take to build in Acton?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Is timber frame cheaper than brick?
It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £2,280 to £4,420 per m² including VAT.
Does a timber frame extension need planning permission?
The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.
Book a free site visit in Acton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.