Acton single-storey extensions, designed and built

From the first sketch to final sign-off, we plan and build single-storey extensions in Acton and the surrounding Greater London area.

  • Guide price in ActonFrom £27,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsTW8, W3, W4, W5, W12
Single-storey rear extension in matching brick with a roof lantern and sliding doors

Extensions in and around Acton

Site visits are available across Acton (TW8, W3, W4, W5, W12, W13). Nearby, we also take on projects in Chiswick (1 mile), Harlesden (2 miles), Shepherds Bush (2 miles), Willesden (2 miles).

For homes towards Surrey, East Molesey is around 8 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Guide prices for Acton

These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Acton: £2,280 to £4,420 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£27,000 – £32,000£31,500 – £41,000£40,500 – £53,500
4 m × 5 m
20 m²
£45,500 – £53,500£53,000 – £68,000£67,500 – £88,500
5 m × 6 m
30 m²
£68,000 – £80,000£79,500 – £101,500£101,000 – £133,000

Try the guide-price tool to see a range for your own size and finish.

What we take care of

  • Planning route checked and the right approval obtained
  • Measured survey and design
  • Walls, steel beams and the new opening into the house
  • Doors, windows, insulation, plastering and first fix to finish
  • Foundations, drainage and groundworks

Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Single-storey extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Acton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of Acton?

Yes. We cover Acton and the surrounding parts of Greater London. Site visits are free and there is no obligation.

How long does a single-storey extension take to build in Acton?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

How deep can a single-storey rear extension be without planning permission?

In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.

Will I need a steel beam?

Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.

Book a free site visit in Acton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote