house-extension.uk

Single-storey rear extensions across Yeadon

Thinking about a single-storey extension for your Yeadon home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in YeadonFrom £19,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsBD10, LS18, LS19, LS20
Single-storey rear extension in matching brick with a roof lantern and sliding doors

Single-storey extension prices in Yeadon

Prices below are for Yeadon, using the Yorkshire and the Humber factor of ×0.94. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Yeadon: £1,640 to £3,200 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£19,500 – £23,500£23,000 – £29,500£29,000 – £38,500
4 m × 5 m
20 m²
£32,500 – £39,000£38,500 – £49,000£48,500 – £64,000
5 m × 6 m
30 m²
£49,000 – £58,000£57,500 – £73,500£73,000 – £96,000

Want a range for your exact size? The guide-price tool takes about a minute.

Included in a typical project

  • Doors, windows, insulation, plastering and first fix to finish
  • Measured survey and design
  • Planning route checked and the right approval obtained
  • Foundations, drainage and groundworks
  • Walls, steel beams and the new opening into the house

Planning and approvals in Yeadon

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Yeadon

Across BD10, LS18, LS19, LS20, we can visit, measure and advise. Nearby, we also take on projects in Guiseley (1 mile), Horsforth (3 miles), Shipley (4 miles), Pudsey (5 miles).

Just over the North Yorkshire border, Harrogate is about 11 miles away. Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Single-storey extension questions answered

Do I need building regulations approval in Yeadon?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of Yeadon?

Yes. We cover Yeadon and the surrounding parts of West Yorkshire. Site visits are free and there is no obligation.

How long does a single-storey extension take to build in Yeadon?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Flat roof or pitched roof?

Flat roofs give more headroom inside and suit lanterns and rooflights; pitched roofs can blend better with older houses. Both meet building regulations when built properly. See our flat roof and pitched roof pages for the details.

Will I need a steel beam?

Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.

Book a free site visit in Yeadon

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote