house-extension.uk

Single-storey rear extensions across Worcester

If you live in Worcester and want more space without moving, a single-storey extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in WorcesterFrom £20,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsWR1, WR2, WR3, WR4, WR5
Single-storey rear extension in matching brick with a roof lantern and sliding doors

Guide prices for Worcester

These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Worcester: £1,700 to £3,300 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£20,000 – £24,000£23,500 – £30,500£30,000 – £40,000
4 m × 5 m
20 m²
£33,500 – £40,000£39,500 – £50,500£50,000 – £66,000
5 m × 6 m
30 m²
£50,500 – £60,000£59,500 – £76,000£75,500 – £99,000

Want a range for your exact size? The guide-price tool takes about a minute.

Local to Worcester

Postcode districts we cover around Worcester include WR1, WR2, WR3, WR4, WR5. The same team covers Droitwich Spa (6 miles), Malvern (7 miles), Stourport-on-Severn (11 miles), Bromsgrove (12 miles), all within easy reach.

The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

What we take care of

  • Building regulations drawings and structural calculations
  • Flat or pitched roof, rooflights or lantern
  • Doors, windows, insulation, plastering and first fix to finish
  • Planning route checked and the right approval obtained

Planning and approvals in Worcester

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions people ask about single-storey extensions

Will my neighbours in Worcester be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Worcester?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a single-storey extension take to build in Worcester?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Will I need a steel beam?

Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.

How much does a single-storey extension cost per square metre?

Our guide range is about £1,700 to £3,300 per m² including VAT, depending on specification. A standard-spec 4 m × 5 m room usually lands at £39,500 to £50,500 in Worcester, plus design and council fees.

Book a free site visit in Worcester

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote