Single-storey rear extensions in Stourport-on-Severn
Thinking about a single-storey extension for your Stourport-on-Severn home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in Stourport-on-SevernFrom £20,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsDY13

What we take care of
- Planning route checked and the right approval obtained
- Building regulations drawings and structural calculations
- Foundations, drainage and groundworks
- Flat or pitched roof, rooflights or lantern
- Doors, windows, insulation, plastering and first fix to finish
How much does a single-storey extension cost in Stourport-on-Severn?
Labour and material costs vary across the UK, so for Stourport-on-Severn we use our West Midlands factor (×0.97). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Stourport-on-Severn: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,000 – £24,000 | £23,500 – £30,500 | £30,000 – £40,000 |
| 4 m × 5 m 20 m² | £33,500 – £40,000 | £39,500 – £50,500 | £50,000 – £66,000 |
| 5 m × 6 m 30 m² | £50,500 – £60,000 | £59,500 – £76,000 | £75,500 – £99,000 |
Try the guide-price tool to see a range for your own size and finish.
Working in Stourport-on-Severn
We cover Stourport-on-Severn and the postcode districts DY13. The same team covers Kidderminster (4 miles), Droitwich Spa (7 miles), Bromsgrove (9 miles), Worcester (11 miles), all within easy reach.
Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Do I need planning permission in Stourport-on-Severn?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Stourport-on-Severn
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Stourport-on-Severn, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a single-storey extension take to build in Stourport-on-Severn?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Will my neighbours in Stourport-on-Severn be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Book a free site visit in Stourport-on-Severn
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.