Single-storey rear extensions in Leyland: design, approvals and build
Planning a single-storey extension in Leyland? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in LeylandFrom £19,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsPR5, PR25, PR26

Working in Leyland
We cover Leyland and the postcode districts PR5, PR25, PR26. Neighbouring towns we cover include Chorley (4 miles), Preston (5 miles), Blackburn (9 miles), Darwen (9 miles).
For homes towards Greater Manchester, Horwich is around 9 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
How much does a single-storey extension cost in Leyland?
Labour and material costs vary across the UK, so for Leyland we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Leyland: £1,660 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £19,500 – £23,500 | £23,000 – £30,000 | £29,500 – £39,000 |
| 4 m × 5 m 20 m² | £33,000 – £39,000 | £38,500 – £49,500 | £49,000 – £65,000 |
| 5 m × 6 m 30 m² | £49,500 – £58,500 | £58,000 – £74,500 | £74,000 – £97,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
What we take care of
- Planning route checked and the right approval obtained
- Doors, windows, insulation, plastering and first fix to finish
- Foundations, drainage and groundworks
- Building regulations drawings and structural calculations
Do I need planning permission in Leyland?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about single-storey extensions
Do you cover all of Leyland?
Yes. We cover Leyland and the surrounding parts of Lancashire. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Leyland, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a single-storey extension take to build in Leyland?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
How deep can a single-storey rear extension be without planning permission?
In England, up to 3 m beyond the original rear wall on a semi-detached or terraced house and 4 m on a detached house, within height and boundary limits. Through the larger home extension prior approval scheme those depths rise to 6 m and 8 m. Wales, Scotland and Northern Ireland use their own rules, which we check for your address.
How much does a single-storey extension cost per square metre?
Our guide range is about £1,660 to £3,230 per m² including VAT, depending on specification. A standard-spec 4 m × 5 m room usually lands at £38,500 to £49,500 in Leyland, plus design and council fees.
Book a free site visit in Leyland
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.