Double-storey extensions in Leyland: design, approvals and build

Our design and build teams take on double-storey extensions in Leyland, from the first measured survey through planning and building control to the finished room.

  • Guide price in LeylandFrom £36,000 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsPR5, PR25, PR26
Two-storey rear extension on a brick semi-detached house with a hipped roof

Working in Leyland

We cover Leyland and the postcode districts PR5, PR25, PR26. Neighbouring towns we cover include Chorley (4 miles), Preston (5 miles), Blackburn (9 miles), Darwen (9 miles).

Just over the Greater Manchester border, Horwich is about 9 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

What should I budget for a double-storey extension in Leyland?

Prices below are for Leyland, using the North West England factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Leyland: £1,470 to £2,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£36,000 – £43,500£41,000 – £54,000£52,000 – £68,500
4 m × 4 m, two floors
32 m²
£47,000 – £56,500£54,500 – £71,500£69,500 – £91,500
4 m × 6 m, two floors
48 m²
£70,500 – £84,500£82,000 – £107,500£104,500 – £137,000

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Leyland?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who a double-storey extension suits

  • Growing families who need a bedroom as well as a bigger kitchen
  • Homeowners who would otherwise consider moving
  • Houses with enough distance to the rear or side boundary

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Double-storey extension questions answered

How long does a double-storey extension take to build in Leyland?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Who do I contract with for a double-storey extension in Leyland?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours in Leyland be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Is a two-storey extension cheaper per square metre?

Usually. Our guide range is about £1,470 to £2,850 per m² of new floor area including VAT, compared with £1,660 to £3,230 per m² for single-storey work, because the foundations and roof are shared across two floors.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Book a free site visit in Leyland

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote