Dunstable single-storey extensions, designed and built

Planning a single-storey extension in Dunstable? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in DunstableFrom £22,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsLU4, LU5, LU6
Single-storey rear extension in matching brick with a roof lantern and sliding doors

Covering Dunstable

Postcode districts we cover around Dunstable include LU4, LU5, LU6. Nearby, we also take on projects in Luton (5 miles), Leighton Buzzard (6 miles), Ampthill (10 miles), Kempston (16 miles).

For homes towards Hertfordshire, Harpenden is around 9 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

Planning and approvals in Dunstable

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What should I budget for a single-storey extension in Dunstable?

Prices below are for Dunstable, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Dunstable: £1,860 to £3,600 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£22,000 – £26,500£26,000 – £33,500£33,000 – £43,500
4 m × 5 m
20 m²
£37,000 – £43,500£43,000 – £55,500£55,000 – £72,500
5 m × 6 m
30 m²
£55,500 – £65,500£65,000 – £83,000£82,500 – £108,500

Try the guide-price tool to see a range for your own size and finish.

What is included

  • Building regulations drawings and structural calculations
  • Foundations, drainage and groundworks
  • Measured survey and design
  • Walls, steel beams and the new opening into the house
  • Flat or pitched roof, rooflights or lantern
  • Planning route checked and the right approval obtained

Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Dunstable

Do you cover all of Dunstable?

Yes. We cover Dunstable and the surrounding parts of Bedfordshire. Site visits are free and there is no obligation.

Will my neighbours in Dunstable be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a single-storey extension take to build in Dunstable?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Will I need a steel beam?

Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.

Can I stay in the house during the build?

Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.

Book a free site visit in Dunstable

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote