Home office extensions for homes in Acton
Acton homeowners can use us for the whole home office extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in ActonFrom £20,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–12 weeks on site
- Postcode districtsTW8, W3, W4, W5, W12

Home office extension prices in Acton
Prices below are for Acton, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Acton: £2,400 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 3.2 m 8 m² | £20,500 – £25,000 | £22,000 – £28,500 | £28,000 – £35,500 |
| 3 m × 3.6 m 11 m² | £26,000 – £31,500 | £30,500 – £39,000 | £38,500 – £49,000 |
| 3 m × 5 m 15 m² | £36,000 – £43,000 | £41,500 – £53,000 | £52,500 – £66,500 |
For a figure based on your own dimensions, use our guide-price tool.
What is included
- Layout for desk, storage and video calls
- Window and rooflight placement to avoid screen glare
- Heating or cooling sized for the room
- Data cabling and plenty of sockets
- Sound insulation to the adjoining rooms
Working in Acton
Site visits are available across Acton (TW8, W3, W4, W5, W12, W13). Nearby, we also take on projects in Chiswick (1 mile), Harlesden (2 miles), Shepherds Bush (2 miles), Willesden (2 miles).
In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Planning rules that apply in Acton
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a home office extension in Acton
Do I need building regulations approval in Acton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Acton be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a home office extension take to build in Acton?
On site, typically 8 to 12 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Is an attached office better than a garden office?
An attached office shares the house heating and broadband, adds floor area to the home, and needs no garden path in the rain. A garden building can be cheaper and quicker but is a separate structure.
Can I claim the cost against tax?
Building work on your home is not normally an allowable business expense, and claiming it can have capital gains tax effects. Speak to an accountant before assuming any tax relief.
Book a free site visit in Acton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end