Side return extensions for homes in Welwyn Garden City
A side return extension in Welwyn Garden City starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in Welwyn Garden CityFrom £19,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsAL6, AL7, AL8, AL10

What is included
- Glazed, sloping or flat roof with rooflights
- Survey of the outrigger, boundary wall and drainage
- New boundary wall or raised party wall
- Removal of the side wall and new steelwork
How much does a side return extension cost in Welwyn Garden City?
Labour and material costs vary across the UK, so for Welwyn Garden City we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Welwyn Garden City: £2,230 to £4,030 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £19,000 – £23,000 | £20,000 – £25,500 | £25,000 – £32,500 |
| 2 m × 5.5 m 11 m² | £24,000 – £29,500 | £27,500 – £35,000 | £34,500 – £44,500 |
| 2.2 m × 7 m 15 m² | £33,000 – £40,000 | £38,000 – £48,000 | £47,500 – £60,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Welwyn Garden City
Our survey diary covers Welwyn Garden City, including AL6, AL7, AL8, AL10. Neighbouring towns we cover include Hatfield (3 miles), Hertford (6 miles), St Albans (6 miles), Harpenden (6 miles).
The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
Planning rules that apply in Welwyn Garden City
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Welwyn Garden City
Will my neighbours in Welwyn Garden City be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Welwyn Garden City, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a side return extension take to build in Welwyn Garden City?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Do side return extensions need planning permission?
In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.
Book a free site visit in Welwyn Garden City
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.