Stratford-upon-Avon side return extensions, designed and built

Planning a side return extension in Stratford-upon-Avon? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in Stratford-upon-AvonFrom £17,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsCV37
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Will the council need to approve it?

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Working in Stratford-upon-Avon

Site visits are available across Stratford-upon-Avon (CV37). The same team covers Warwick (8 miles), Leamington Spa (10 miles), Kenilworth (12 miles), Bedworth (22 miles), all within easy reach.

For homes towards Worcestershire, Evesham is around 12 miles away. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

Is a side return extension right for your house?

  • Narrow galley kitchens
  • Victorian and Edwardian terraces with a rear outrigger
  • Homes where the garden is too small to lose much depth

How much does a side return extension cost in Stratford-upon-Avon?

For Stratford-upon-Avon we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Stratford-upon-Avon: £2,040 to £3,690 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£17,000 – £21,000£18,500 – £23,500£23,000 – £29,500
2 m × 5.5 m
11 m²
£22,000 – £27,000£25,500 – £32,500£32,000 – £41,000
2.2 m × 7 m
15 m²
£30,500 – £36,500£34,500 – £44,000£43,500 – £55,500

For a figure based on your own dimensions, use our guide-price tool.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions people ask about side return extensions

Who do I contract with for a side return extension in Stratford-upon-Avon?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do you cover all of Stratford-upon-Avon?

Yes. We cover Stratford-upon-Avon and the surrounding parts of Warwickshire. Site visits are free and there is no obligation.

How long does a side return extension take to build in Stratford-upon-Avon?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Can I combine a side return with a rear extension?

Yes. That combination is a wraparound extension, which adds the most space to a terraced house.

Will the kitchen be darker?

Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.

Book a free site visit in Stratford-upon-Avon

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote