Side return extensions in Bedworth
A side return extension in Bedworth starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in BedworthFrom £17,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsCV12

Planning rules that apply in Bedworth
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Design to keep daylight in the middle of the house
- Glazed, sloping or flat roof with rooflights
- Party wall notice support (England and Wales)
- New boundary wall or raised party wall
- Kitchen-ready shell or full finish
Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.
Working in Bedworth
Site visits are available across Bedworth (CV12). Nearby, we also take on projects in Nuneaton (3 miles), Atherstone (8 miles), Kenilworth (10 miles), Rugby (11 miles).
The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
How much does a side return extension cost in Bedworth?
For Bedworth we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Bedworth: £2,040 to £3,690 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £17,000 – £21,000 | £18,500 – £23,500 | £23,000 – £29,500 |
| 2 m × 5.5 m 11 m² | £22,000 – £27,000 | £25,500 – £32,500 | £32,000 – £41,000 |
| 2.2 m × 7 m 15 m² | £30,500 – £36,500 | £34,500 – £44,000 | £43,500 – £55,500 |
Try the guide-price tool to see a range for your own size and finish.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Bedworth home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Bedworth
Will my neighbours in Bedworth be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a side return extension take to build in Bedworth?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do I need building regulations approval in Bedworth?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Can I combine a side return with a rear extension?
Yes. That combination is a wraparound extension, which adds the most space to a terraced house.
Book a free site visit in Bedworth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.