house-extension.uk

Side return extensions for homes in Rochester

Rochester homeowners can use us for the whole side return extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in RochesterFrom £20,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsME1, ME2, ME4, ME7
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Side return extension prices in Rochester

For Rochester we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Rochester: £2,350 to £4,260 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£20,000 – £24,000£21,500 – £27,000£26,500 – £34,500
2 m × 5.5 m
11 m²
£25,500 – £31,000£29,500 – £37,000£36,500 – £47,000
2.2 m × 7 m
15 m²
£35,000 – £42,500£40,000 – £50,500£50,000 – £64,000

Try the guide-price tool to see a range for your own size and finish.

Covering Rochester

We cover Rochester and the postcode districts ME1, ME2, ME4, ME7. Nearby, we also take on projects in Chatham (1 mile), Strood (1 mile), Gillingham (2 miles), Gravesend (7 miles).

For homes towards Essex, Stanford-le-Hope is around 10 miles away. In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

What we take care of

  • Kitchen-ready shell or full finish
  • Removal of the side wall and new steelwork
  • New boundary wall or raised party wall
  • Survey of the outrigger, boundary wall and drainage
  • Design to keep daylight in the middle of the house
  • Party wall notice support (England and Wales)

Planning and approvals in Rochester

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Side return extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Rochester, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a side return extension take to build in Rochester?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do you cover all of Rochester?

Yes. We cover Rochester and the surrounding parts of Kent. Site visits are free and there is no obligation.

Will the kitchen be darker?

Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

Book a free site visit in Rochester

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote