Home office extensions in Rochester
From the first sketch to final sign-off, we plan and build home office extensions in Rochester and the surrounding Kent area.
- Guide price in RochesterFrom £17,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–12 weeks on site
- Postcode districtsME1, ME2, ME4, ME7

What we take care of
- Layout for desk, storage and video calls
- Window and rooflight placement to avoid screen glare
- Data cabling and plenty of sockets
- Sound insulation to the adjoining rooms
North-facing glass and rooflights give steadier light for screen work. Where the office faces south, we use deeper reveals or external shading to keep glare and heat down.
Covering Rochester
Across ME1, ME2, ME4, ME7, we can visit, measure and advise. Neighbouring towns we cover include Chatham (1 mile), Strood (1 mile), Gillingham (2 miles), Gravesend (7 miles).
Stanford-le-Hope, in Essex, is roughly 10 miles from Rochester and also on our list. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Home office extension prices in Rochester
Prices below are for Rochester, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Rochester: £2,070 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 3.2 m 8 m² | £17,500 – £21,500 | £19,000 – £24,500 | £24,000 – £30,500 |
| 3 m × 3.6 m 11 m² | £22,500 – £27,500 | £26,000 – £33,500 | £33,000 – £42,000 |
| 3 m × 5 m 15 m² | £31,000 – £37,000 | £36,000 – £45,500 | £45,000 – £57,500 |
Try the guide-price tool to see a range for your own size and finish.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Rochester home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about home office extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Rochester, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a home office extension take to build in Rochester?
On site, typically 8 to 12 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Do I need building regulations approval in Rochester?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Is an attached office better than a garden office?
An attached office shares the house heating and broadband, adds floor area to the home, and needs no garden path in the rain. A garden building can be cheaper and quicker but is a separate structure.
How much does a home office extension cost?
Our guide range is about £2,070 to £3,810 per m² including VAT. An 11 m² standard-spec office is typically £26,000 to £33,500 in Rochester.
Book a free site visit in Rochester
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.