house-extension.uk

Side return extensions in Basingstoke

We design and build side return extensions for houses in Basingstoke, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in BasingstokeFrom £20,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsRG21, RG22, RG23, RG24, RG25
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Guide prices for Basingstoke

Labour and material costs vary across the UK, so for Basingstoke we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Basingstoke: £2,350 to £4,260 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£20,000 – £24,000£21,500 – £27,000£26,500 – £34,500
2 m × 5.5 m
11 m²
£25,500 – £31,000£29,500 – £37,000£36,500 – £47,000
2.2 m × 7 m
15 m²
£35,000 – £42,500£40,000 – £50,500£50,000 – £64,000

Want a range for your exact size? The guide-price tool takes about a minute.

Working in Basingstoke

Postcode districts we cover around Basingstoke include RG21, RG22, RG23, RG24, RG25. Nearby, we also take on projects in Alton (9 miles), Fleet (11 miles), Yateley (12 miles), Aldershot (14 miles).

Thatcham, in Berkshire, is roughly 12 miles from Basingstoke and also on our list. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

Is a side return extension right for your house?

  • Victorian and Edwardian terraces with a rear outrigger
  • Homes where the garden is too small to lose much depth
  • Narrow galley kitchens

Will the council need to approve it?

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Basingstoke

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Basingstoke, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need building regulations approval in Basingstoke?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a side return extension in Basingstoke?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will the kitchen be darker?

Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

Book a free site visit in Basingstoke

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote