Side return extensions in Alton: design, approvals and build
Alton homeowners can use us for the whole side return extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in AltonFrom £20,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsGU34

When a side return extension makes sense
- Homes where the garden is too small to lose much depth
- Victorian and Edwardian terraces with a rear outrigger
- Narrow galley kitchens
Planning and approvals in Alton
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
The planning position for a specific Alton address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Alton
Site visits are available across Alton (GU34). Nearby, we also take on projects in Bordon (5 miles), Basingstoke (9 miles), Fleet (11 miles), Aldershot (11 miles).
For homes towards Surrey, Farnham is around 9 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Side return extension prices in Alton
These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Alton: £2,350 to £4,260 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £20,000 – £24,000 | £21,500 – £27,000 | £26,500 – £34,500 |
| 2 m × 5.5 m 11 m² | £25,500 – £31,000 | £29,500 – £37,000 | £36,500 – £47,000 |
| 2.2 m × 7 m 15 m² | £35,000 – £42,500 | £40,000 – £50,500 | £50,000 – £64,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about side return extensions
Do I need building regulations approval in Alton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a side return extension in Alton?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a side return extension take to build in Alton?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Can I combine a side return with a rear extension?
Yes. That combination is a wraparound extension, which adds the most space to a terraced house.
Book a free site visit in Alton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end