house-extension.uk

Side extensions in Trowbridge: design, approvals and build

We design and build side extensions for houses in Trowbridge, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in TrowbridgeFrom £22,000 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsBA14
Single-storey side extension with a gable roof beside a block-paved drive

What is included

  • Survey, design and street-view drawings
  • New openings through the side wall
  • Structure, roof tied into the house
  • Planning route checked or application made
  • Foundations near boundaries and any drains

Covering Trowbridge

Site visits are available across Trowbridge (BA14). The same team covers Melksham (5 miles), Devizes (10 miles), Warminster (10 miles), Chippenham (10 miles), all within easy reach.

In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

What should I budget for a side extension in Trowbridge?

These guide figures apply our South West England adjustment (×1.02) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Trowbridge: £1,780 to £3,470 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£22,000 – £27,000£25,000 – £32,500£31,500 – £42,000
3 m × 6 m
18 m²
£32,000 – £39,000£37,500 – £49,000£47,500 – £62,500
3 m × 8 m
24 m²
£42,500 – £51,500£50,000 – £65,000£63,500 – £83,500

Want a range for your exact size? The guide-price tool takes about a minute.

Do I need planning permission in Trowbridge?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Trowbridge home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a side extension in Trowbridge

Will my neighbours in Trowbridge be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a side extension in Trowbridge?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a side extension take to build in Trowbridge?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Can I build a side extension without planning permission?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a planning application.

How close to the boundary can I build?

It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.

Book a free site visit in Trowbridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote