Timber frame extensions for homes in Trowbridge

If you live in Trowbridge and want more space without moving, a timber frame extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in TrowbridgeFrom £21,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–14 weeks on site
  • Postcode districtsBA14
Timber frame extension under construction with OSB sheathing and roof joists

Covering Trowbridge

We cover Trowbridge and the postcode districts BA14. Neighbouring towns we cover include Melksham (5 miles), Devizes (10 miles), Warminster (10 miles), Chippenham (10 miles).

For homes towards Somerset, Bath is around 8 miles away. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.

Guide prices for Trowbridge

For Trowbridge we adjust our national guide rates by ×1.02, the factor we use for South West England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Trowbridge: £1,780 to £3,470 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£21,000 – £26,000£25,000 – £32,500£31,500 – £42,000
4 m × 5 m
20 m²
£35,500 – £43,000£41,500 – £54,500£53,000 – £69,500
5 m × 6 m
30 m²
£53,500 – £64,500£62,500 – £81,500£79,500 – £104,500

Try the guide-price tool to see a range for your own size and finish.

Planning and approvals in Trowbridge

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Is a timber frame extension right for your house?

  • Contemporary designs with timber or board cladding
  • Homeowners who want strong energy performance
  • Sites where weight or speed matters

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Timber frame extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Trowbridge, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a timber frame extension take to build in Trowbridge?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Do I need building regulations approval in Trowbridge?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Is timber frame cheaper than brick?

It is similar overall. The frame can save time on site, but the cladding choice has a big effect on cost. Our guide range is about £1,780 to £3,470 per m² including VAT.

Does a timber frame extension need planning permission?

The same planning rules apply as for any extension. If the cladding looks different from the house, permitted development’s matching-materials condition may mean an application is needed.

Book a free site visit in Trowbridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote