Side extensions across Morden
Planning a side extension in Morden? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in MordenFrom £28,500 inc VAT
- PlanningSingle storey can be permitted development
- Build time10–18 weeks on site
- Postcode districtsCR4, SM1, SM3, SM4, SW19

Working in Morden
Our survey diary covers Morden, including CR4, SM1, SM3, SM4, SW19, SW20. We also work in nearby Mitcham (1 mile), Wimbledon (2 miles), Worcester Park (2 miles), Tooting (2 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
When a side extension makes sense
- Houses where the rear garden is small
- Homes needing a utility, study or ground-floor bedroom
- Detached and semi-detached houses with side land
Councils often prefer side extensions to sit slightly back from the front of the house with a lower roof, so the original building still reads clearly. We design to those principles from the start to avoid redesigns.
Planning rules that apply in Morden
In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Side extension prices in Morden
For Morden we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Morden: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 5 m 12 m² | £28,500 – £34,500 | £31,500 – £41,500 | £40,500 – £53,500 |
| 3 m × 6 m 18 m² | £40,500 – £49,500 | £47,500 – £62,500 | £60,500 – £80,000 |
| 3 m × 8 m 24 m² | £54,500 – £66,000 | £63,500 – £83,000 | £81,000 – £106,500 |
Try the guide-price tool to see a range for your own size and finish.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Morden home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Questions people ask about side extensions
Who do I contract with for a side extension in Morden?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a side extension take to build in Morden?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Do you cover all of Morden?
Yes. We cover Morden and the surrounding parts of Greater London. Site visits are free and there is no obligation.
How close to the boundary can I build?
It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.
Can I build over my driveway?
Yes, if the foundations work and you keep any parking the council requires. Drains and services under drives are common, so we check before design.
Book a free site visit in Morden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.