Atherstone pitched roof extensions, designed and built

If you live in Atherstone and want more space without moving, a pitched roof extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in AtherstoneFrom £21,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsCV9
Single-storey extension with a clay-tiled pitched roof and roof windows

Guide prices for Atherstone

For Atherstone we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Atherstone: £1,790 to £3,400 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£21,500 – £25,500£25,000 – £32,500£32,000 – £41,000
4 m × 5 m
20 m²
£35,500 – £42,000£41,500 – £53,500£53,000 – £68,000
5 m × 6 m
30 m²
£53,500 – £63,000£62,500 – £80,500£80,000 – £102,000

Try the guide-price tool to see a range for your own size and finish.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Roof design matched to the existing pitch and tiles
  • Lead or proprietary flashings to the main wall
  • Vaulted ceilings or flat ceilings with storage above
  • Roof windows positioned for light and ventilation
  • Insulation to current building regulations

Working in Atherstone

Our survey diary covers Atherstone, including CV9. Neighbouring towns we cover include Nuneaton (6 miles), Bedworth (8 miles), Kenilworth (16 miles), Rugby (19 miles).

Tamworth, in Staffordshire, is roughly 7 miles from Atherstone and also on our list. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Atherstone home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Your questions about a pitched roof extension in Atherstone

Do I need building regulations approval in Atherstone?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Atherstone be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a pitched roof extension take to build in Atherstone?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Is a pitched roof better than a flat roof?

Neither is better in all cases. Pitched roofs blend with traditional houses and shed water quickly; flat roofs give more headroom and suit modern designs and lanterns.

How much does a pitched roof extension cost?

Our guide range is about £1,790 to £3,400 per m² including VAT, a little more than a flat roof because of the roof structure and tiles.

Book a free site visit in Atherstone

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote