Extensions over a garage across Mirfield
Our design and build teams take on over-garage extensions in Mirfield, from the first measured survey through planning and building control to the finished room.
- Guide price in MirfieldFrom £22,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsWF14

When an over-garage extension makes sense
- Detached and link-detached houses with an attached garage
- Homes where the landing can connect to the new room
- Families needing a bedroom without losing garden
Fitting the new room to the existing landing is the planning puzzle inside the house. We design the connection first, then the roof, so the extension does not end up with awkward steps or a corridor through a bedroom.
Over-garage extension prices in Mirfield
For Mirfield we adjust our national guide rates by ×0.94, the factor we use for Yorkshire and the Humber. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Mirfield: £1,690 to £3,200 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £22,500 – £28,000 | £23,500 – £30,500 | £30,000 – £38,500 |
| Over a large single garage 16 m² | £27,000 – £33,500 | £31,500 – £41,000 | £40,500 – £51,500 |
| Over a double garage 24 m² | £40,500 – £50,000 | £47,000 – £61,000 | £60,500 – £77,000 |
Try the guide-price tool to see a range for your own size and finish.
Covering Mirfield
Postcode districts we cover around Mirfield include WF14. Neighbouring towns we cover include Liversedge (2 miles), Heckmondwike (2 miles), Dewsbury (3 miles), Batley (3 miles).
Just over the South Yorkshire border, Darton is about 9 miles away. Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.
Will the council need to approve it?
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about over-garage extensions
Do you cover all of Mirfield?
Yes. We cover Mirfield and the surrounding parts of West Yorkshire. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Mirfield, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does an over-garage extension take to build in Mirfield?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Mirfield
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.