Extensions over a garage in Halifax
Thinking about an over-garage extension for your Halifax home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in HalifaxFrom £22,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsHD6, HX1, HX2, HX3, HX4

Who an over-garage extension suits
- Homes where the landing can connect to the new room
- Detached and link-detached houses with an attached garage
- Families needing a bedroom without losing garden
How much does an over-garage extension cost in Halifax?
These guide figures apply our Yorkshire and the Humber adjustment (×0.94) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Halifax: £1,690 to £3,200 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £22,500 – £28,000 | £23,500 – £30,500 | £30,000 – £38,500 |
| Over a large single garage 16 m² | £27,000 – £33,500 | £31,500 – £41,000 | £40,500 – £51,500 |
| Over a double garage 24 m² | £40,500 – £50,000 | £47,000 – £61,000 | £60,500 – £77,000 |
For a figure based on your own dimensions, use our guide-price tool.
Working in Halifax
We cover Halifax and the postcode districts HD6, HX1, HX2, HX3, HX4, HX5. The same team covers Brighouse (3 miles), Huddersfield (5 miles), Cleckheaton (6 miles), Liversedge (6 miles), all within easy reach.
Saddleworth, in Greater Manchester, is roughly 13 miles from Halifax and also on our list. Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.
Planning rules that apply in Halifax
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Over-garage extension questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Halifax, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Halifax be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Halifax?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Halifax
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.