Extensions over a garage in Deal: design, approvals and build
A over-garage extension in Deal starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in DealFrom £26,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsCT14

Who an over-garage extension suits
- Families needing a bedroom without losing garden
- Homes where the landing can connect to the new room
- Detached and link-detached houses with an attached garage
What should I budget for an over-garage extension in Deal?
Labour and material costs vary across the UK, so for Deal we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Deal: £2,020 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £26,500 – £33,000 | £28,000 – £36,500 | £36,000 – £46,000 |
| Over a large single garage 16 m² | £32,000 – £39,500 | £37,500 – £48,500 | £48,000 – £61,000 |
| Over a double garage 24 m² | £48,000 – £59,500 | £56,000 – £73,000 | £72,500 – £91,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Deal
Postcode districts we cover around Deal include CT14. Nearby, we also take on projects in Dover (8 miles), Ramsgate (8 miles), Broadstairs (9 miles), Margate (11 miles).
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Will the council need to approve it?
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Over-garage extension questions answered
How long does an over-garage extension take to build in Deal?
On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Who do I contract with for an over-garage extension in Deal?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do you cover all of Deal?
Yes. We cover Deal and the surrounding parts of Kent. Site visits are free and there is no obligation.
Can my garage take the weight of a room on top?
Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Deal
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.