Orangery extensions for homes in Telford
Planning an orangery extension in Telford? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in TelfordFrom £29,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsTF1, TF2, TF3, TF4, TF7

How much does an orangery extension cost in Telford?
Prices below are for Telford, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Telford: £2,330 to £4,360 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £29,000 – £35,500 | £32,500 – £41,000 | £39,500 – £52,500 |
| 4 m × 4 m 16 m² | £37,000 – £45,500 | £43,000 – £54,500 | £52,500 – £70,000 |
| 4 m × 6 m 24 m² | £55,500 – £68,000 | £65,000 – £81,500 | £79,000 – £105,000 |
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in Telford?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
When an orangery extension makes sense
- Those who want daylight without overheating
- Period and detached houses with a garden view
- Homeowners replacing an older conservatory
The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.
Working in Telford
We cover Telford and the postcode districts TF1, TF2, TF3, TF4, TF7, TF8. Neighbouring towns we cover include Wellington (3 miles), Bridgnorth (11 miles), Shrewsbury (13 miles), Market Drayton (15 miles).
Wolverhampton, in West Midlands, is roughly 15 miles from Telford and also on our list. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about orangery extensions
Do you cover all of Telford?
Yes. We cover Telford and the surrounding parts of Shropshire. Site visits are free and there is no obligation.
Do I need building regulations approval in Telford?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Telford, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Book a free site visit in Telford
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.