house-extension.uk

Bedroom extensions in Telford

Our design and build teams take on bedroom extensions in Telford, from the first measured survey through planning and building control to the finished room.

  • Guide price in TelfordFrom £25,000 inc VAT
  • PlanningUsually a householder application
  • Build time14–22 weeks on site
  • Postcode districtsTF1, TF2, TF3, TF4, TF7
Bedroom in an extension with a roof window and an en-suite shower room

Extensions in and around Telford

Across TF1, TF2, TF3, TF4, TF7, TF8, we can visit, measure and advise. Nearby, we also take on projects in Wellington (3 miles), Bridgnorth (11 miles), Shrewsbury (13 miles), Market Drayton (15 miles).

Wolverhampton, in West Midlands, is roughly 15 miles from Telford and also on our list. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

When a bedroom extension makes sense

  • Multi-generational households
  • Growing families
  • Homeowners who want an en-suite master bedroom

New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.

Guide prices for Telford

Prices below are for Telford, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Telford: £1,550 to £3,100 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£25,000 – £31,000£25,000 – £33,000£27,500 – £37,500
Bedroom and en-suite
18 m²
£27,500 – £34,500£33,000 – £43,000£41,500 – £56,000
Two rooms
30 m²
£46,500 – £57,000£55,000 – £71,500£69,500 – £93,500

For a figure based on your own dimensions, use our guide-price tool.

Planning rules that apply in Telford

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Telford home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Bedroom extension questions answered

Do I need building regulations approval in Telford?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a bedroom extension take to build in Telford?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Who do I contract with for a bedroom extension in Telford?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I add a ground-floor bedroom for a relative?

Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.

Will a new bedroom need planning permission?

Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.

Book a free site visit in Telford

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote