house-extension.uk

Orangery extensions in Southall: design, approvals and build

We design and build orangery extensions for houses in Southall, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in SouthallFrom £39,000 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsTW5, UB1, UB2, UB3, UB4
Orangery extension with brick piers, a glass roof lantern and French doors

What we take care of

  • Opening into the main house
  • Heating sized for the glass area
  • Design of piers, roof perimeter and lantern proportions
  • Foundations, walls and insulated perimeter roof
  • Aluminium or timber lantern and full-height glazing

What should I budget for an orangery extension in Southall?

Prices below are for Southall, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Southall: £3,120 to £5,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£39,000 – £47,500£43,500 – £55,000£53,000 – £70,500
4 m × 4 m
16 m²
£49,500 – £60,500£58,000 – £73,000£70,500 – £94,000
4 m × 6 m
24 m²
£74,500 – £90,500£87,000 – £109,500£106,000 – £140,500

Want a range for your exact size? The guide-price tool takes about a minute.

Will the council need to approve it?

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Extensions in and around Southall

Across TW5, UB1, UB2, UB3, UB4, W7, we can visit, measure and advise. We also work in nearby Greenford (2 miles), Heston (2 miles), Hayes (Hillingdon) (2 miles), Isleworth (3 miles).

London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Orangery extension questions answered

How long does an orangery extension take to build in Southall?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do I need building regulations approval in Southall?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Southall be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How much does an orangery cost?

Our guide range is about £3,120 to £5,850 per m² including VAT, so a 16 m² standard-spec orangery is typically £58,000 to £73,000 in Southall.

Does an orangery need planning permission?

It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.

Book a free site visit in Southall

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote