Orangery extensions in South Croydon
Planning an orangery extension in South Croydon? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in South CroydonFrom £39,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsCR0, CR2, CR7, CR8, CR9

Working in South Croydon
Site visits are available across South Croydon (CR0, CR2, CR7, CR8, CR9, SM6). We also work in nearby Croydon (1 mile), Purley (2 miles), Wallington (3 miles), South Norwood (3 miles).
For homes towards Surrey, Caterham is around 6 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
Included in a typical project
- Opening into the main house
- Thermal calculations where glazing is generous
- Aluminium or timber lantern and full-height glazing
- Heating sized for the glass area
- Foundations, walls and insulated perimeter roof
How much does an orangery extension cost in South Croydon?
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in South Croydon: £3,120 to £5,850 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £39,000 – £47,500 | £43,500 – £55,000 | £53,000 – £70,500 |
| 4 m × 4 m 16 m² | £49,500 – £60,500 | £58,000 – £73,000 | £70,500 – £94,000 |
| 4 m × 6 m 24 m² | £74,500 – £90,500 | £87,000 – £109,500 | £106,000 – £140,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in South Croydon
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Orangery extension questions answered
Will my neighbours in South Croydon be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for an orangery extension in South Croydon?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in South Croydon?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in South Croydon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.